Case Studies
Historic Timber Bridges in Switzerland
Information
The course starts with a series of introductory lectures on the topic. On the first lecture date, participants have to get together in groups and are assigned a tutor. In the following weeks, two introductory lectures and one on-site introductory lecture take place at a nearby bridge. Afterwards, the groups work on a concrete case study on site.
As part of the course, 4 full days on site are to be planned, two of them before the first intermediate critique!
Please find the detailed process in the Download Assignment (PDF, 655 KB)
Dates and Deadlines FS 2024
Friday, 23 February, 15:45-17:30, HIL E 7
Lecture I (Construction Systems in Historical Wooden Bridge Building) and distribution of objects to the students
Friday, 01 March, 15:45-17:30, HIL E 7
Lecture II (Construction details in historical timber bridge construction)
Friday, 08 March
Joint bridge visit in two groups (15:15 / 16 h), location: Glattbrücke Rümlang (tram 10 to Rümlang Bäuler, then approx. 15 min. walk),
external page Standort
Intermediate meeting at your bridge (obligatory):
by individual arrangement, but no later than Friday, 19 April
Deadline for submission (HIT H 43): by Friday, 17 May, 12 noon at the latest.
Downloads
Please change to the German version of the website to download additional teaching resources (students of ETH Zurich only).
Contact
Bauforschung u.Konstruktionsgesch.
Wolfgang-Pauli-Str. 27
8093
Zürich
Switzerland